====== Differences ====== This shows you the differences between two versions of the page.
soc:2011:meteger:project_plan:start [2011/05/22 08:03] meteger created |
soc:2011:meteger:project_plan:start [2011/05/22 08:35] (current) meteger |
||
---|---|---|---|
Line 37: | Line 37: | ||
code cleanups; extensive testing and bugfixing; call for testers on gpxe-devel | code cleanups; extensive testing and bugfixing; call for testers on gpxe-devel | ||
- | |||
==== Week 7-12 ==== | ==== Week 7-12 ==== | ||
- | More bugfixes as we discover new bugs; syncing with updates applied to the linux driver in the meantime. | + | More tg3 bugfixes as we discover new bugs; syncing with updates applied to the linux driver in the meantime. |
- | |||
- | |||
- | ==== Week 7-12 ==== | ||
If the schedule works out as expected, repeat process for atl driver(there are several atl drivers for which we have received feature requests, we will have to figure out which are the most sensible ones to do). | If the schedule works out as expected, repeat process for atl driver(there are several atl drivers for which we have received feature requests, we will have to figure out which are the most sensible ones to do). | ||